Case study · FalseGreen on FalseGreen
Tests passed. FalseGreen still refused to call it done.
FalseGreen found a production integrity/authority problem that made the work unacceptable — after all the ordinary signals were green.
Different parts of the system disagreed about what was authorized. FalseGreen said FAILED.